331.
▲
by
doikor
4y ago
They do still get around 60% speedup up according to phoronix https://www.phoronix.com/review/amd-zen4-avx512/6 > On average for the tested AVX-512 workloads, making use of the AVX-512 instructions led to aroun
332.
▲
by
doikor
4y ago
Gamers nexus kind of does that https://www.youtube.com/watch?v=nRaJXZMOMPU&t=704s Basically how many watts required to do some fix unit of work (to render 1 frame using Blender CPU rendering)
333.
▲
by
doikor
4y ago
Yes for nuclear the emissions are very close to 0 (lower or on par with wind depending on the study). The best time to start building new low emission capacity was 3 or 4 decades ago like that France did but the next best time is today. I r
334.
▲
by
doikor
4y ago
> Nuclear and renewables are like oil and water: they don't mix well. Funnily enough TVO (the owner and operator of Olkiluoto the site where his new reactor is at) also owns a bunch of hydro (and a little bit of wind). Though the hy
335.
▲
by
doikor
4y ago
We really don't know this. There were 4 other companies that took part in the bidding process and were in it quite seriously but dropped off when the government signaled it would only give permit for a single reactor (so no 2x800MW etc
336.
▲
by
doikor
4y ago
The number I gave includes both capital and operational costs. here is a newer one from Q2 this year https://www.tvo.fi/material/collections/20220713160120/7aj2c... On the page 8 in the graph you can see the
337.
▲
by
doikor
4y ago
Those 2 reactors have had the costs to build them paid a long time ago with the money they generated. So that is truly all the costs left to operate then and thus what TVO bills the share holders or that reactor to buy the electricity from
338.
▲
by
doikor
4y ago
And? Europe consumes more gas then it produces and thus it has no real control over the price of it.
339.
▲
by
doikor
4y ago
> the last attempt to do so didn't go so well. It has been running for months now (doing tests). And for these latest delays we should mainly blame the Germans (Siemens) due to their faulty automation systems and steam turbine. Can&
340.
▲
by
doikor
4y ago
The % of actual gas used does not matter much as the price is set by the most expensive form of production at that moment. Most of the time this is a peaker gas (or oil) plants if it is required to run one. So if you normally need to run th
341.
▲
by
doikor
4y ago
> when it's "just" faulty concrete or welding. In Finland during construction the local nuclear safety company found reinforced concrete that had 0 rebar in it etc forcing a lot of stuff to be redone due to someone trying
342.
▲
by
doikor
4y ago
> - build as much PV as possible (there is plenty of space on roofs) There is effectively 0 sun during the winter in Finland. Just go to https://www.fingrid.fi/en/electricity-market-information/sol... and look
343.
▲
by
doikor
4y ago
> I didnt say it was. However, France (Areva) making a "bad contract" is why this plant exists at all. If Areva did not make such a low bid they would have probably chosen another bid by another provider.
344.
▲
by
doikor
4y ago
> €(120 - 20) * 2 + 20 = €220/MWh. No idea about Hinkley Point but TVOs 2 earlier reactors have costs in the 15 to 20€/MWh range with average market prices around 30 to 40€/MWh they are making healthy profits with the reac
345.
▲
by
doikor
4y ago
And to add to that the country saving Germany and France from this mess is Sweden with its nuclear + hydro + wind (mostly nuclear+hydro though) (and Norway too with its massive hydro capacity)
346.
▲
by
doikor
4y ago
> In Finland's case the French state (Areva) provided the indirect €5 billion subsidy to get this plant built. Finland wasnt going to shoulder the full costs itself. It has no military nuclear interests. Areva made a bid so low that
347.
▲
by
doikor
4y ago
Even before this new reactor Finland had lower gCO₂eq/kWh than Germany or Austria (with way harsher winters to boot). Once this thing starts Finland will get even further ahead. In Europe basically only France and the other Nordic coun
348.
▲
by
doikor
4y ago
> up to 8.7GW (and probably never less than 1GW). And then we would also would have had to build ~8GW of new gas/oil/coal plants or dam more rivers for hydro. Electricity is used for heating in Finland. Not having enough electr
349.
▲
by
doikor
4y ago
> In Finland, Hydro combined with wind should take care of baseload. Nuclear and hydro are the baseload generation in Finland at the moment and will be far into the future. Hydro is also used to handle peaks. Imports are mostly hydro to
350.
▲
by
doikor
4y ago
> The energy supply breakdown for Finland appears to be predominantly about a successful Nuclear deployment for electricity and social / district heating. Sadly nuclear isn't used for district heating at all. There is a LOT of
351.
▲
by
doikor
4y ago
> higher capacity transmission lines only means that more electricity will be exported and more of those countries would suffer. Build better transmission within the country but not between countries. The transmission lines between count
352.
▲
by
doikor
4y ago
> This can only be the case if the government is not acting in good faith, and has planned for this eventuality. Because during normal times it actually leads to cheaper prices. It has only really been an issue now due to the crisis. Als
353.
▲
by
doikor
4y ago
Large parts of the east one is not allowed to build anything very tall (including wind turbines) due to national defense. The turbines mess with radar. But still we got our own NIMBYs who like to complain a lot. edit: And the best places to
354.
▲
by
doikor
4y ago
> a relatively small amount of electricity demand Finland has the highest energy consumption per capita in EU. (over 2x Germany for example) Winters are cold and we use electricity for heating a lot (gas furnaces at homes are very rare).
355.
▲
by
doikor
4y ago
As a Finn I don't want to have my "do I freeze to death this winter" to be in the hands of any other foreign country be it friendly or not. Obviously it has not been in such a state for a long time but hopefully we can get th
356.
▲
by
doikor
4y ago
There is a lot of NIMBYism though. Also large parts of the east of the country can't really build wind power as it messes with defense (military radars at the Russian border). But still a lot of space and the best spots to build wind i
357.
▲
by
doikor
4y ago
It also has a lot to do with not enough transmission capacity to get the electricity from north to south. At this very moment the spot price in north most pricing region Tromso is a lot cheaper than in Oslo region (~1/10th). Sweden has
358.
▲
by
doikor
4y ago
I honestly now have no idea what you are trying to say.
359.
▲
by
doikor
4y ago
I've worked my whole career in tech (ok a couple summers as a bicycle mechanic and doing forest work while younger) and all of those in a union shop. Seems to be just fine to me though I don't have any experience of it not being l
360.
▲
by
doikor
4y ago
They are mostly different due to the market where they work in being very different. This is a good thing. No point in trying to put the exact same organization everywhere. For lawyers much more of them work for small law firms as average u