3 ms·
But post build and commissioning you don't need most of those full time. And given the way google run the dc the workload is a lot less than say an big IBM sysp
by walshemj 11y ago
But post build and commissioning you don't need most of those full time. And given the way google run the dc the workload is a lot less than say an big IBM sysplex.
I bet you could run a Google style DC in normal ops with 3 or 4 people per shift plus security guards.
That's assuming they even bother with a 356/24h shift
You just fly in the specialized teams and new hardware already racked up when you need to.