4 ms·
Say you're the tech lead for the project, built before 2001 [1], and you need to hire a vendor that can provide a cluster that won't break with 100TB+ and guara
by icebraining 11y ago
Say you're the tech lead for the project, built before 2001 [1], and you need to hire a vendor that can provide a cluster that won't break with 100TB+ and guarantee long term support, possibly for decades.
Who would you call?
[1] http://www.law.umaryland.edu/marshall/crsreports/crsdocuments/RL31512_02112004.pdf http://www.law.umaryland.edu/marshall/crsreports/crsdocument...
- bigiain 11y agoI don't remember the exact timeframes, but I suspect Digital and Sun Microsystems were likely looking choices around that time. (Sun was the default choice for Telco billing systems around then...)
- needusername 11y agoWhy do you need a cluster?
- jpatokal 11y agoBack in 2001, 100TB was massive. The first 1 TB HDD didn't roll out until 2007.
- needusername 11y agoIt's my understanding that most of this is pictures and not "actual rows", the database without the pictures should be much smaller. You could put the pictures on a SAN.