Why Agile and Scrum Are Terrible
- bluejekyll 11y agoThe comments on the main article are too long. This isn't a problem with Agile/Scrum. This is a problem with poor management and not setting up teams for success. The entire point of Agile is to enable teams to deliver on their own schedule and by their own rules, with the team made up of all the people who will enable that to happen.
- JoeAltmaier 11y agoThe OP makes real points about the failings of Agile. The Engineering team ends up subject to the whim of the Product Owner, or worse yet the PO is absent and things stall. Senior Engineers get marginalized, since they do things that can take longer than a sprint or have to do with internals not directly related to business needs. And Engineering is about a lot more than features. Agile works for some development groups. But it definitely does NOT work for many others.
- mcv 11y agoAll the points it makes about Agile are utter nonsense. In what way does the engineering team end up subject to the whim of the PO? The PO needs to provide the details of what the business needs (someone needs to do that, after all), and what the priorities are, but he's in no way in charge of the team. If the team has no PO for a significant amount of time, that does mean that a vital part of the team is missing, but I'd like to see any dev team build something without any idea of the business needs. It's the PO's job to communicate those needs, and the great thing about Scrum is that he does so as part of the team, rather from some distant ivory tower. I also don't see in what way Senior engineers get marginalized. If anything, everybody gets treated as senior, because everybody gets ownership, responsibility and decision making power about the project (though in reality, it's of course the seniors with the clearest ideas and tend to end up with most of the control over the team). And there's generally plenty of room to include stories (even very large ones if they can't be cut up, though they usually can) about internals, infrastructure and R&D on the backlog. It's absolutely true that it's not for everybody, but your criticism and that of the article don't hold much water.
- AnimalMuppet 11y agoI think that the PO criticism is this: An incompetent or indecisive PO can cripple an agile process. That's true, but (except possibly in the case of a startup), there's always a non-technical layer of management over you somewhere, and if that layer is incompetent or indecisive, your project is equally in trouble. Labeling that layer "PO" and the process "agile" changes exactly nothing about the problem. I've been in an agile process. It worked, mostly, but it broke down when the PO didn't have the time to do the work. (It was huge for an agile team - 30 people - which put a huge amount of pressure on the PO position). For the next project, the PO "didn't have time" to give us actual requirements - just "improved reporting". In the most amazing display of agile that I've ever seen, the development team lined up a series of customer conference calls to expose their requirements for reporting, and proceeded to run the entire development process without a PO. And that worked amazingly well... ... right up until three weeks before the scheduled end of the project. (We were probably going to miss by a week, on a six-month project.) Then product management showed up and said "We like what you're doing. But we need these additional things as well. Oh, and we can't change the end date." Predictably, that was the end of agile, as well as the end of any management reality for that project. (You think you can add three months of work without changing the end date? The real world will demonstrate to you that you cannot in fact do that.)
- mcv 11y ago30 people in a single team? Yeah, that's way, way too big. I've been in some teams that were technically too big, but those were still less than half that. Still, good job making it work despite utterly dysfunctional management there. Agile does require that management understands what you're doing and what their role in that is. But again, that's true in any other situation too.
- AnimalMuppet 11y agoWell, it worked really well for the release before that. It took a really strong proponent who was willing to hack process as we went along, but it worked - for us, for a while.
- dragonwriter 11y ago> The OP makes real points about the failings of Agile. The OP makes some real points about failings of management that predate Agile, and are common even where the word "Agile" isn't used, and occur (among other places) in places that use "Agile" as an empty buzzword the same as the same type of organizations would use the name of any other approach that was popular if Agile wasn't around. But none of it really has anything to do with Agile. Very little of it even has to do with Scrum (which, as an actual defined process rather than an approach to selecting/using processes, is at least subject to process-oriented criticism.) And, perhaps most importantly, no solutions/alternatives are offered.
- JoeAltmaier 11y agoAgile is an engineering process. It is supposed to solve problems. Those problems remain. Ergo, Agile isn't working. We can be apologists all we want for Agile but it remains true, it often fails to improve things at all.
- dragonwriter 11y agoNo, Agile is not a process, engineering or otherwise. Agile is a set of principles which can guide the selection of a process and how it is applied, but it is not a process (indeed, it is fairly expressly a response to the fetishization of process.) And I am unconvinced by your claim that Agile isn't working, that is, I am unconvinced that the problems Agile exists to mitigate are not reduced in organizations that actually apply the Agile principles in hour they approach work. OTOH, I do think the "Agile" brand had failed because a while lot of applications of canned process in rote ways -- the thing Agile directly opposed -- is being sold as being Agile methods. Agile isn't an engineering process, its the the idea of applying problem- and resource- (including the staff on the team) specific engineering to the development process.
- JoeAltmaier 11y agoThat's pretty weak - its not a process, its an idea of a process. Whatever. Applying this idea of a process often fails, obstructs senior engineers and does nothing to enable the rank and file as advertised.
- mcv 11y agoI've seen this kind of strawman argument against Agile before, though this one builds a bigger and more detailed strawman than I've seen before. The problem here is not Agile, it's slapping the label "Agile" on something and then doing something totally different. The great thing about Agile is that it's not business driven. I mean, of course you the work for business reasons, and the business people who have determined what they need, need to be available to the Agile team (for example in the form of a Product Owner in the case of Scrum), but in the end, it's the team of developers that makes the decisions about how they do it. Of all the claims that this article makes about Agile, I haven't spotted even a single one that's correct. All of them are quite obviously false. The article is a piece of junk.
- jmccree 11y agoIt seems like you are invoking the No true Scotsman fallacy. There's a lot of companies that do "Agile" and "Scrum" that are exactly like he describes. When Feature X has to be done this sprint because it's already been sold to (Board|Client|Investors|Other Dept), there's not much time to think about "How?", it's more like "If I'm going to be working Sat and Sun again?". I'm sure there are organizations out there where Agile/Scrum is working fantastic for them in practice, and developers are happy with their work and career prospects. I just have yet to encounter one in the wild personally.
- AnimalMuppet 11y agoWords have meanings, or they are useless. So, let's define "agile". It doesn't mean "apply a label to any process that you already have". So, where do we find a definition for agile? Probably the best candidate is the Agile Manifesto. But there's not much concrete process there, so now what? I worked in an agile (and, in fact, XP) environment for a while. The rule there was that the product manager owned the decision of what stories went into the project, but the technical team owned the estimates. That's kind of agile-y (we're doing stories and estimates, yay for us!), but it's also just good engineering management. If you're in a situation where "Feature X has to be done this sprint because it's already been sold to (Board|Client|Investors|Other Dept)", you're in trouble whether or not you call your process "agile". The trouble you're in doesn't have much to do with whether you're agile or not, either - it has to do with management that doesn't listen to engineering reality. (However, it is a violation of at least one of the principles from the agile manifesto - sustainable pace.)
- dragonwriter 11y ago> It’s probably not a secret that I dislike the “Agile” fad that has infested programming. One of the worst varieties of it, Scrum, is a nightmare that I’ve seen actually kill companies. Scrum is not a variety of Agile. Agile is, per the Agile Manifesto, an approach to software development which prioritizes (among other things) individuals and interactions over processes and tools. Scrum is a tool (a process, arguably, though it describes itself as a "framework" as opposed to a "process", since any complete process will need to add to what is presented in the Scrum Guide) laid out in a "definitive guide" providing the "rules of the game". An organization might be applying Agile principles and use Scrum, but those are largely orthogonal concerns. > So what are Scrum and “Agile”? I could get into the different kinds of meetings (“retrospective” and “backlog grooming” and “planning”) or the theory, but the fundamental unifying trait is violent transparency, often one-sided. Programmers are, in many cases, expected to provide humiliating visibility into their time and work, meaning that they must play a side game of appearing productive in addition to their actual job duties. This does describe the actual process in many places, but it has nothing to do with "Agile" or "Scrum". It is a fairly common management failure that was common among the canned one-size-fits-all processes many things that the Agile Manifesto was a reaction against; Scrum -- as defined in the Scrum Guide -- insofar as it incorporates what might be described as "violent transparency", does not do so in a one-sided manner. "Lots of things that are called 'Agile' have problems because continue to do things -- which are also common without the 'Agile' label -- that the Agile Manifesto was a direct response against" isn't a substantive criticism of Agile, though its a good warning -- as is, after all, the Agile Manifesto itself -- against buying a canned process or tool and applying it just because the person selling it says the word "Agile".