3 ms·
I am unfamiliar with the paneláky, but I would be surprised if they were built at a comparable speed. While I am aware of large building shells which have been
by nkoren 11y ago
I am unfamiliar with the paneláky, but I would be surprised if they were built at a comparable speed. While I am aware of large building shells which have been constructed on this sort of timescale, they still required many months/years of fit-out afterwards (plumbing, electricity, fine interior finishing). what is unique about what Broad Group is doing is that they are assembling fully fitted-out modules, which are essentially ready for move-in the day after construction is complete. The only historical analogues I'm aware of are things like Moshe Safde's Habitat 67[1] and some Japanese "metabolist" buildings.[2] But those have been architectural experiments without any real financial viability. What Broad Group is doing is unique in that they are making it commercially viable at scale.
1: http://en.wikipedia.org/wiki/Habitat_67 http://en.wikipedia.org/wiki/Habitat_67
2: http://en.wikipedia.org/wiki/Metabolism_%28architecture%29 http://en.wikipedia.org/wiki/Metabolism_%28architecture%29
- minthd 11y agoIn the article they mentioned the issue of leaks.I read about it in another piece about an American pre-fab building, where it has been a huge problem. What do you think about that issue ? how can it be solved ?