ITER's cost is inflated because it includes a lot of research that would not take place in working power plant. Based on the physical cost of ITER and the scali
by Retric 17y ago
ITER's cost is inflated because it includes a lot of research that would not take place in working power plant. Based on the physical cost of ITER and the scaling factor in fusion reactors a multi GW design similar to ITER should be close to the cost of fission. However, it has significant political advantages both for non-proliferation reasons and Not In My Back Yard reasons.
Lead under heavy neutron bombardment becomes radioactive as does all other materials with long term heavy neutron bombardment.
PS: If you are interested in fusion I would suggest you look at fusor.net. It's a message board for amateurs but there are some solid posts relating to the amount of neutrons produced per watt of net fusion energy for the better fusion materials. As well as a look into the cost of shielding etc.
Edit: http://en.wikipedia.org/wiki/JT-60 http://en.wikipedia.org/wiki/JT-60 JT-60 does not have the facilities to handle Tritium; currently only the JET tokamak has such facilities. In fusion terminology JT60 achieved conditions which in D-T would have provided Q=1.25 where Q is the ratio of fusion power to input power.
http://en.wikipedia.org/wiki/DEMO http://en.wikipedia.org/wiki/DEMO DEMO must have linear dimensions about 15% larger than ITER... Subsequent commercial fusion reactors could be built for nearly a quarter of the cost of DEMO if things go according to plan.[2][3]