It's a great project, but that article is a bit deceptive. The breakthrough video is from 2010. Official opening is a year away. The tunnels are finished, with
by Animats 11y ago
It's a great project, but that article is a bit deceptive. The breakthrough video is from 2010. Official opening is a year away. The tunnels are finished, with track, power, and signaling almost ready.[1] But the connections to the railway system at both ends aren't ready yet.
As tunnel projects go, it was a long drive, but not an unusually difficult one. Mostly hard rock, some water problems, but not too much water. Many tunneling projects are more about keeping the water out and the roof supported than digging.
Surprisingly, it was just a 4 TBM job, two tubes cut entirely from the ends. Although there are several vertical shafts down to emergency stations, those were not used as TBM starting points. Each TBM had to grind forward for almost 14 years.
[1] https://www.alptransit.ch/en/status-of-the-work/railway-infrastructure/ https://www.alptransit.ch/en/status-of-the-work/railway-infr...