3 ms·
I find it fascinating that much of the hold up is having multiple signalling systems for each country in their train. Is there a web site that talks about the d
by ChuckMcM 11y ago
I find it fascinating that much of the hold up is having multiple signalling systems for each country in their train. Is there a web site that talks about the different systems in some more detail? I've been following Caltrain's installation of new signalling (in theory to support more frequent trains and the high speed rail service) and was surprised to find them as complicated as they are.
- ZanyProgrammer 11y agoYou might be interested in this update of CBOSS and Caltrain. http://caltrain-hsr.blogspot.com/2015/05/cboss-headed-for-trouble.html http://caltrain-hsr.blogspot.com/2015/05/cboss-headed-for-tr...
- gpvos 11y agoWikipedia isn't too bad on this: https://en.wikipedia.org/wiki/Category:Train_protection_systems https://en.wikipedia.org/wiki/Category:Train_protection_syst... - and see my reply elsewhere on this page: https://news.ycombinator.com/item?id=9631443 https://news.ycombinator.com/item?id=9631443 I would expect there to be a few real experts on HN, though. (I'm not one.)
- pjmlp 11y agoThe track sizes and electricity are also problematic. Portuguese and Spanish tracks have a smaller width than the rest of Europe. So Portuguese trains only travel to Spain (the few that exist). And Spanish trains have a system where they can change the width between the wheels when going to France. Similarly, trains travelling between Belgium and Germany, if I am not mistaken, have dual electricity system.
- gpvos 11y agoBorder-crossing lines are utterly fascinating. The traditional visual signalling system tends to change exactly at the border, but you may find pre-signals just inside the other country. The in-cabin signalling and automatic train protection may or may not change at the same location. Changeover of the electrical system is more elaborate, and can take place at the border, a few kilometers inside one of the countries, or at one of the larger stations on either side, in which case you will find switchable tracks at that station. There are different allowed widths and heights ("loading gauge") for train cars in different countries. Finally, few people know that the overhead lines veer a little bit to the left and right to spread the wear on the pantographs. The extent to which this happens also differs between countries, and some countries have narrower pantographs than others, which means that trains cannot just ride both in Germany and Switzerland even though they have the same electrical system.
- moschlar 11y agoAt least for German signalling rules, these sites are trying to explain it in English: http://www.sh1.org/eisenbahn/index.htm http://www.sh1.org/eisenbahn/index.htm or http://www.joernpachl.de/German_principles.htm http://www.joernpachl.de/German_principles.htm (Railway Engineering professor)