4 ms·
> if you ignore the economics of the situation The classic software development triangle. "The iron triangle refers to the concept that of the three critical
by wallflower 17y ago
> if you ignore the economics of the situation
The classic software development triangle.
"The iron triangle refers to the concept that of the three critical factors scope, cost, and time at least one must vary otherwise the quality of the work suffers. Nobody wants a poor quality system, otherwise why build it? Therefore the implication is that at least one of the three vertexes must be allowed to vary. The problem is that when you try to define the exact level of quality, the exact cost, the exact schedule, and the exact scope to be delivered you virtually guarantee failure because there is no room for a project team to maneuver.
Software development projects often fail because the organization sets unrealistic goals for the "iron triangle" of software development:
* Scope (what must be built)
* Schedule (when it must be built by)
* Resources (how much it must cost)"
http://www.ambysoft.com/essays/brokenTriangle.html http://www.ambysoft.com/essays/brokenTriangle.html
- davidw 17y agoOr the quick version: "fast, cheap, good: pick two".