http://calearth.org/faq.html#timetobuild http://calearth.org/faq.html#timetobuild The construction schedule depends on how large the project is and how much la
by dredmorbius 12y ago
http://calearth.org/faq.html#timetobuild http://calearth.org/faq.html#timetobuild
The construction schedule depends on how large the project is and how much labor is available. There are optimal numbers of personnel if the project is to be built without any kind of mechanization. The rate at which the mix is produced dictates how fast a project can go. The optimal number seems to be 7 persons where one or two are making mix and the remainder are split into two groups laying two bags at the same time. From past experience there are some fairly predictable estimates as to what can be achieved: 1) Three reasonably-fit persons can work very efficiently laying 100 linear ft of bag per day. 2) A double eco-dome (see web-site under "buildings and designs" can be built in just 10 weeks. (This is bag work alone - and it is estimated that all finish work will take about the same amount of time.) There are, of course, time-saving techniques which are discussed during workshops and training sessions.
- netcan 12y agoCool! Though, one of those double eco-domes is a pretty ambitious project for a weekend DIY-er. It's a whole tatooine house!^ What I had in mind is say, a 3-4 meter (diameter) dome with one door, one small window. How long would that take 1 parent + 2 (lazy goodfornothing) teens? Another small project might be 1.5m walls to surround an existing gazebo or emote other backyard structure. IE, something that's undeniably a building but is accessible, ideally as far under 1,000 man-hours as possible. ^If you build one of these, please don't leave out the below surface courtyard. It's essential!