3 ms·
> Unfortunately, the baseline assumption isn't correct. To quibble with that quibble, though the steel mills thing is in the title, I wouldn't call it a "basel
by twotwotwo 11y ago
> Unfortunately, the baseline assumption isn't correct.
To quibble with that quibble, though the steel mills thing is in the title, I wouldn't call it a "baseline assumption" of the longer discussion in the post: the post talks about how power affects datacenter costs, with one sentence at the end mentioning steel mills.
He links the "steel mills" phrase to a page on a Microsoft datacenter in Quincy, WA. I don't know much about the history of that area, but I did read that another Microsoft datacenter was built in The Dalles, OR, which had very cheap power and historically was home to aluminum manufacturers that needed a lot of power for the electrolytic process involved:
http://www.nytimes.com/2006/06/14/technology/14search.html?ei=&_r=0 http://www.nytimes.com/2006/06/14/technology/14search.html?e... mentions the datacenter and that aluminum smelters were once in the area
http://en.wikipedia.org/wiki/Aluminium_smelting http://en.wikipedia.org/wiki/Aluminium_smelting talks more about the process and how it takes "prodigious amounts of electricity"
- butchlugrod 11y agoQuincy, like The Dalles, is located near the Columbia River, and is an hour drive to the Grand Coulee, Chief Joseph, Wanapum, Rock Island, and Rocky Reach hydroelectric dams. Electricity in central Washington is very inexpensive. Since that article was written, Dell, Yahoo, Vantage, and Sabey have all constructed data centers in the Quincy area.
- AllexS 11y agoAlso note that a very large reason for constructing Rocky Reach Dam on the Columbia was to provide power for an Alcoa Aluminum plant that is still heavily dependent on cheap energy prices. Chelan, Douglas and Grant counties all have nearly the cheapest power rates the the country.