3 ms·
According to the link in the article: http://hub.aa.com/en/nr/pressrelease/american-airlines-completes-electronic-flight-bag-implementation http://hub.aa.com/e
by userbinator 12y ago
According to the link in the article:
http://hub.aa.com/en/nr/pressrelease/american-airlines-completes-electronic-flight-bag-implementation http://hub.aa.com/en/nr/pressrelease/american-airlines-compl...
35 pounds, or around 16kg. That is rather heavy...
I'm thinking that they should not all carry iPads, but have one iPad and one other device from a different manufacturer running different software but with the same information, for redundancy purposes. The weight of carrying an iPad and backup device is still tiny compared to what it replaced.
- pmelendez 12y ago> , but have one iPad and one other device from a different manufacturer running different software Exactly my thoughts. I am surprised they didn't have any contingency plan as backup.
- draugadrotten 12y ago> they didn't have any contingency plan as backup. Do you have any Source of your claim that there was no contingency plan? FAA regulations seems to indicate that there are plans: "(5) Procedural means. g. Procedural Mitigations. If one or more onboard EFBs fail, resulting in loss of function or the presentation of false or hazardously misleading information, a contingency plan or process will need to be in place to provide the required information." Page 23, http://www.faa.gov/documentlibrary/media/advisory_circular/ac%20120-76b.pdf http://www.faa.gov/documentlibrary/media/advisory_circular/a...
- pmelendez 12y agoThe same articles says: "The pilot told us when they were getting ready to take off, the iPad screens went blank, both for the captain and copilot, so they didn’t have the flight plan,” " (emphasis mine) What I meant is taht they didn't have a second electronic contingency plan. Probably they had to switch to paper on those flights (otherwise the impact would have been minimal)
- Osmium 12y ago> and one other device from a different manufacturer running different software but with the same information, for redundancy purposes This sounds like a great idea in theory, but as far as I know in practice isn't ideal. Problems include less familiarity with the second system/more training time required, issues with the second system may not be discovered since it's used less, and less incentive to get the first system right in the first place. What would perhaps be better is a backup running a previous software version, maybe.