For the conveyor, and the work from the time the planes arrived at the hub until they left, was an issue. We had a guy, Mike Basch, Senior VP Planning, from Ra
by graycat 12y ago
For the conveyor, and the work from
the time the planes arrived at the hub until they
left, was an issue. We had a guy,
Mike Basch, Senior VP Planning,
from Rapistan, big in conveyor systems.
I got involved for a while: I tried to
do a continuous time, discrete
state space Monte Carlo simulation,
but it got too big to do at all
easily and we dropped it.
So, the hub design was done with just
back of the envelope arithmetic
and engineering. It worked fine
for years.
Over the years, the fleet
scheduling problem went through
various phases.
The first phase that worked
at all well was just my
software.
The last time
I checked (I'd left for my Ph.D.),
the package volume was high
enough that
one of Fred's ideas became the
solution: At noon, have all the
planes at distant cities.
Then, in the evening, loaded up,
all the planes fly to Memphis.
Nearly all the flights are
non-stop -- one plane, one flight,
one city served. So, net, first
cut, no scheduling problem at all.
Maybe there could still be problems
for scheduling maintenance,
considerations for remote sort
hubs and/or international service,
but that was all after I left.