28 ms·
Volume is key. Volume to push price of silicon panels down to have electricity reach grid parity levels. An intesting project (which I think has been ditched or
by antr 12y ago
Volume is key. Volume to push price of silicon panels down to have electricity reach grid parity levels. An intesting project (which I think has been ditched or put on hold) is/was DESERTEC. Install thousands of PV pannels in the Sahara dessert, and connect this to energy-hungry Europe thorugh a new HVDC grid connection.
Source: http://en.wikipedia.org/wiki/Desertec http://en.wikipedia.org/wiki/Desertec