31 ms·
This is from last December. The latest [1] is that Bertha was successfully moved into the access pit, and they're starting to disassemble the cutter for repairs
by nkrumm 12y ago
This is from last December. The latest [1] is that Bertha was successfully moved into the access pit, and they're starting to disassemble the cutter for repairs. Engineers on site did measure a ~1" sink of surrounding soil, but downtown Seattle is still standing.
[1] http://www.wsdot.wa.gov/Projects/Viaduct/Contents/Item/Display/2162 http://www.wsdot.wa.gov/Projects/Viaduct/Contents/Item/Displ...