4 ms·
On a team level? Total lines of code added (starting at total lines removed, then counting upwards). We want to see +150 per developer/week otherwise the TL ha
by Someone1234 12y ago
On a team level?
Total lines of code added (starting at total lines removed, then counting upwards). We want to see +150 per developer/week otherwise the TL has to explain it to the GM. We also have a manager who run a code consistency checker and flag any submits which don't conform to the standards (e.g. {} not on their own line, variables named incorrectly, etc). There are also reports that come out of the CS ticket system against each part of the system which are meant to be bug reports (most aren't) which we need to fix and close, teams are ranked against each other on fewest reports and most closed/month.
- lambdafunc 12y ago>> We also have a manager who run a code consistency checker and flag any submits which don't conform to the standards Why don't you do this during build time using build plugins or using commit hooks instead of a manager doing it?
- Someone1234 12y agoBecause it has to be recorded for their annual review.
- mrits 12y agoI take it the GMs goal is to convert succinct code into a verbose masterpiece? My joke is that the code base should be getting smaller every week because we are all getting better.