"ITER has been designed to produce 500 MW of output power for 50 MW of input power" and its construction "will require 16,000 tons of rebar, 150,000 m³ of concr
by DennisP 12y ago
"ITER has been designed to produce 500 MW of output power for 50 MW of input power" and its construction "will require 16,000 tons of rebar, 150,000 m³ of concrete and 7,500 tons of steel for the building structures." [0]
By comparison, "a MW of installed capacity for wind requires 460 metric tons of steel and 870 m3 of concrete compared to the 98 metric tons of steel and 160 m3 of concrete for coal, and the even lower 40 metric tons of steel and 90 m3 of concrete for nuclear" [1]
So to match ITER's 450MW net with wind power, your turbines would require 270,000 metric tons of steel and 391,500 m^3 of concrete, several times more than ITER will need.
This neglects thermal inefficiency for ITER, but on the other hand ITER is an experimental reactor and the followup DEMO plant is supposed to get 2 to 4 gigawatts with a size only 15% larger. [2] Also, the wind figures are for capacity, not actual output, so the numbers are pretty comparable anyway...it'd be reasonable to assume 30% thermal efficiency and 30% wind capacity factor.
But you're right that ITER/DEMO has a pretty long timeline, which is why I favor smaller-scale alternate approaches (as well as advanced fission).
[0] http://www.iter.org/factsfigures http://www.iter.org/factsfigures
[1] http://www.forbes.com/sites/jamesconca/2012/07/01/is-the-answer-my-friend-blowing-in-the-wind/ http://www.forbes.com/sites/jamesconca/2012/07/01/is-the-ans...
[2] http://en.wikipedia.org/wiki/DEMO http://en.wikipedia.org/wiki/DEMO
- TheSpiceIsLife 12y agoThank you.