3 ms·
> Some magnet about 20 feet across was moved last year, and they had to close off a roads at night to get the thing to a barge port. For fun stuff of that sort
by masklinn 12y ago
> Some magnet about 20 feet across was moved last year, and they had to close off a roads at night to get the thing to a barge port.
For fun stuff of that sort, there was moving OXCART (the future A12/SR-71) from the Lockheed SkunkWorks assembly plant to Area 51 (a ~750 miles journey with the package being wider than many road at the time) for testing: http://www.roadrunnersinternationale.com/transporting_the_a-12.html http://www.roadrunnersinternationale.com/transporting_the_a-...
And the A380 parts moving through a small french village to reach the assembly plant: http://www.cnet.com/news/the-giant-airbus-a380-and-the-tiny-french-village/ http://www.cnet.com/news/the-giant-airbus-a380-and-the-tiny-... Because it's a pan-european project the A380 route is pretty extensive and varied, on the final part of the water journey they actually have to play with the tides as some barge sections need high tide to go through, but bridges require low tide to get under.