3 ms·
If you're into reading plans for pie-in-the-sky projects that will never [1] happen, you can read about it here. http://www.interbering.com/ http://www.interber
by ghaff 12y ago
If you're into reading plans for pie-in-the-sky projects that will never [1] happen, you can read about it here. http://www.interbering.com/ http://www.interbering.com/
$134 billion price tag and apply the usual multiples including not only the tunnel but lots of connecting rail through what I imagine is pretty difficult-to-build territory. (UPDATE: Of which it seems about 4,000 miles worth is needed.)
Fun read though.
[1] for interesting timeframes to contemplate
- grecy 12y agoThis article [1] has the tunnel at only $10 to $12 billion, and the whole rail interconnect at around $65 billion. [1] http://www.bloomberg.com/apps/news?pid=newsarchive&sid=a0bsMii8oKXw http://www.bloomberg.com/apps/news?pid=newsarchive&sid=a0bsM...
- jrockway 12y agoMeanwhile, over in the real world, it's cost 4.5 billion to build a tunnel in Manhattan from 63rd St. to 96th St.
- evanb 12y agoBuilding under Manhattan is a little bit more complicated, since slight vibrations / rumblings can cause buildings to come deviate from plumb. http://thelaunchbox.blogspot.com/2009/06/june-6-7-2009.html http://thelaunchbox.blogspot.com/2009/06/june-6-7-2009.html http://thelaunchbox.blogspot.com/2009/06/june-29-2009.html http://thelaunchbox.blogspot.com/2009/06/june-29-2009.html http://www.dnainfo.com/new-york/20120821/upper-east-side/huge-second-avenue-subway-blasts-rock-rattle-upper-east-side http://www.dnainfo.com/new-york/20120821/upper-east-side/hug... http://www.dnainfo.com/new-york/20130911/upper-east-side/second-ave-building-evacuated-after-facade-cracks-found http://www.dnainfo.com/new-york/20130911/upper-east-side/sec...
- grecy 12y agoIf you think far Northern Alaska or Russia are anything like "The Real World" (as you call Manhattan), you need to get out more.
- jrockway 12y agoI'm just saying that every megaproject I've ever seen costs some small amount on paper, then the second ground is broken, we start seeing huge cost overruns that make the original number look tiny. 10 billion for a tunnel under the Bering Strait. Suuuure....