3 ms·
I think Joe might have been referring to transmission and switching costs. Adding generation capacity to the grid usually means that you need more substations,
by abakker 12y ago
I think Joe might have been referring to transmission and switching costs. Adding generation capacity to the grid usually means that you need more substations, and control infrastructure.