4 ms·
Depends on the type of capacity. I gather that peaking power is typically provided by gas combustion turbines (https://en.wikipedia.org/wiki/Gas_turbine#Indust
by hga 12y ago
Depends on the type of capacity. I gather that peaking power is typically provided by gas combustion turbines (https://en.wikipedia.org/wiki/Gas_turbine#Industrial_gas_turbines_for_power_generation https://en.wikipedia.org/wiki/Gas_turbine#Industrial_gas_tur...), which have much lower capital costs and much higher operating costs (including maintenance). But if you need more baseline, then, yeah, you're going to be spending a lot of money, although I'd expect modern gas powered baseline plants to be relatively cheap (don't ask about nuclear, and fuel handling is much easier than coal, plus coal is nasty dirty stuff that needs exhaust cleaning, and disposal of ash).
- abakker 12y agoI think Joe might have been referring to transmission and switching costs. Adding generation capacity to the grid usually means that you need more substations, and control infrastructure.