You don't have to get to grid scale for 25 kWh to seem like not much. Your average, underfunded community or educational theater has 150-200 lighting dimmers,
by superuser2 12y ago
You don't have to get to grid scale for 25 kWh to seem like not much.
Your average, underfunded community or educational theater has 150-200 lighting dimmers, each at 2.4 kW. I can consume half a megawatt (200 circuits x 20A x 120V = 480kW) in 6 keystrokes.
- dredmorbius 12y agoTo be fair, Beacon gangs its units -- you wouldn't have a single 25 kWh module, but an installation of them. The company's demonstration project is a 20 MW capacity plant with 200 flywheels. http://www.energycentral.com/generationstorage/energystorage/news/vpr/11127/Beacon-Power-Flywheel-Plant-in-Stephentown-Reaches-Full-20-MW-Capacity http://www.energycentral.com/generationstorage/energystorage... The other factor is that when you're operating at grid scale, it's overall changes to the grid flow that you're concerned with. A large city might have a peak load of 2000 MW, and the plant here could handle a fluctuation of 10% -- given the law of large numbers, that's a lot. Sure, you might be turning on a slew of light banks in any given period, but someone somewhere else could be cycling down a cooling plant, or resistance heater, or the like. I suspect large rapidly cycling loads might also be at issue -- with electrified transit, light rail and trolley buses make high instant demands on the grid, and then return energy through regenerative braking. I don't know how such loads are managed, but they're substantial and I do know that utilities tend to segregate these from other residential and commercial circuits.
- JshWright 12y agoYou need some LEDs man...
- deleted 12y ago[deleted]