3 ms·
Enlarging an existing line is very unlikely to be cheaper than building a new line - you'd need a one-of-a-kind special TBM to handle the lining of the existing
by lmm 12y ago
Enlarging an existing line is very unlikely to be cheaper than building a new line - you'd need a one-of-a-kind special TBM to handle the lining of the existing tunnels, you'd still need to re-lay the track and electrics, you'd still need to enlarge the stations meaning you'd still need worksites on the surface and possibly knocking down buildings to dig access shafts and so on. And you'd have to shut down the existing line while you were doing it, which there isn't usually spare capacity for.
Newer lines (i.e. Thameslink, Crossrail, Crossrail 2) are being built for mainline-sized trains; I don't think there'll ever be a new tube-diameter tunnel under London except for short extensions to existing lines. But we're going to be stuck with the ones we already have for a while yet.