3 ms·
Base load power is something of a misnomer. You can easily design a nuclear / coal power-plant that goes from 60-90% capacity vary quickly. The issue is that
by Retric 12y ago
Base load power is something of a misnomer. You can easily design a nuclear / coal power-plant that goes from 60-90% capacity vary quickly. The issue is that lowers efficiency, both when operating outside the normal range, worse simply having that capacity also lowers peak efficiency.
In the end it's a trade-off from a more flexible grid vs more flexible power-plants. Granted, most coal/nuclear power plants are not currently designed to be flexible for these reasons and they take a while do a cold start vs simply changing output within a fixed range.