4 ms·
The grid doesn't really care about load changes provided they are predictable (and peak demand in specific areas doesn't exceed maximum capacity). There's norm
by gilgoomesh 12y ago
The grid doesn't really care about load changes provided they are predictable (and peak demand in specific areas doesn't exceed maximum capacity).
There's normally a 2 hour lead time to bring larger plants on line so provided you can predict changes in demand with that much lead, there's no real problem.