2 ms·
There are core designs for low enriched uranium loading, mixed thorium loading, and spent fuel loadings. Have to make sure a fuel design works before it's clai
by jddw 12y ago
There are core designs for low enriched uranium loading, mixed thorium loading, and spent fuel loadings. Have to make sure a fuel design works before it's claimed to work.
- beefman 12y agoWith 12 years of burnup? I've been having trouble getting burnup codes to handle thorium. What are you using? Apparently I should be using Serpent. But anyway, 12 years is too long, even if it's feasible. Something like 4 years should be better, due to the learning curve on these. For instance, think of a reactor in the field as a ship on a long trip while technology at home continues to improve http://en.wikipedia.org/wiki/Wait_Calculation http://en.wikipedia.org/wiki/Wait_Calculation Edit: The lower the enrichment, and the lower the excess reactivity, the better.