3 ms·
More on generating responsiveness, as I understand it. Natural gas plants can be "spun up" in about 15 minutes. This is because they run as directly-fired tur
by dredmorbius 12y ago
More on generating responsiveness, as I understand it.
Natural gas plants can be "spun up" in about 15 minutes. This is because they run as directly-fired turbines, so there's no time required to build up a head of steam.
Standby diesel generators can be fired up even more quickly (a couple of minutes), though these are expensive and somewhat less efficient.
Hydroelectric power also has an activation response measured in single-digit minutes, or even seconds -- open a sluice gate, synchronize to the grid, and you're on. A fair amount of California's hydro power is used specifically to match against current demand and larger blocks of power bought from elsewhere.
Geothermal is also fairly responsive, though it's got a limited total output. For California, The Geysers (among the largest geothermal generating plants in the world) has a total capacity of 725 MW (this is down from the peak largely due to groundwater exhaustion, with various re-injection schemes proposed and partially adopted).
http://www.calpine.com/media/Geysers_Factsheet.pdf http://www.calpine.com/media/Geysers_Factsheet.pdf
Coal (virtually unused in California) and nuclear (one plant, Diablo Canyon) have very long ramp-up periods, but can be operated as "spinning reserve" by wasting their unused thermal output. This is particularly expensive for