6 ms·
Reanimating Bertha, a Mechanical Behemoth Slumbering Under Seattle
- aligajani 12y agoIt's so funny that I spend hours aligning a box 1px to the right and then there are people doing this Bertha stuff. Man, I feel like crap now :P
- notauser 12y agoUnfortunately "big engineering" is 10% fun and 90% filling out paperwork - and with a few exceptions the paperwork part is the only bit that offers any career progression. Documentaries rarely bother filming the 200 guys who spend years working in office parks on P6 plans and CAD models to plan everything to the Nth degree!
- masklinn 12y agoAnd even the "fun" is 90% boring. The tunneling itself is maintaining the TBM as it's doing its thing and crawling along at ~30ft/day. Seeing them in action for 10mn is fun (I did and the scale is awe-inspiring) but I'd expect working on them to be more on the boring side.
- notacoward 12y agoFortunately, when you're working on them you're away from the boring side. ;)
- judk 12y agoHey you didn't cause a $125M catastrophe.
- notauser 12y agoIf you like this, then you'll really like the series currently running on the BBC about the crossrail excavation - they have some great video of the TBMs in operation. http://www.crossrail.co.uk/news/articles/the-bbc-goes-behind-the-scenes-for-crossrail-documentary-series http://www.crossrail.co.uk/news/articles/the-bbc-goes-behind... If you are in London, you might also like the Brunel Museum which is at the end of a tunnel under the river which was hang-dug using a human powered TBM. You can go down into the Rotherhithe shaft which was the staging post for a lot of the digging. The museum itself is pretty small but the guided walks are great. http://www.brunel-museum.org.uk/history/the-thames-tunnel/ http://www.brunel-museum.org.uk/history/the-thames-tunnel/
- icelancer 12y agoPretty cool how a project that took 10+ years to agree on is going to make traffic worse in the 4th most congested metropolitan area in the US and cost 2-5x as much. All around a fine bureaucratic job by everyone involved.
- _delirium 12y agoWell one alternative floated was to simply to demolish the unsafe viaduct with no replacement, as San Francisco did with the Embarcadero Freeway after the '89 earthquake. My preferred alternative, and much cheaper! However that wasn't a popular suggestion, probably because it would be worse for traffic (at least in the medium-term), especially given Seattle's not-great public transit. Another alternative is to rebuild the viaduct, which would be cheaper than a tunnel but still very expensive, and would probably require it to be closed in the interim anyway, because it basically needs a complete replacement of the unsound 1950s structure, not just more reinforcement. Or, of course, keep the viaduct as is and hope there aren't any major earthquakes...
- techsupporter 12y ago> Seattle's not-great public transit I like Seattle's public transit. As for the tunnel, how about giving the right-of-way to Sound Transit and let them build the Ballard/West Seattle rail route through there? They seem to be doing quite well at digging tunnels pretty much everywhere.
- larubbio 12y agoSeattle Transit Blog had a post that touched on that topic. (which I can't find) I think the reason to not do that is that the tunnel is too deep so you would not have stations downtown since the cost of each station is more then a transit only tunnel.
- Crito 12y agoWhat there is of Seattle's transit is good. The problem is that coverage is poor, it relies too heavily on buses (I'd love some more comprehensive regional rail...) and the buses are over capacity and underfunded. Otherwise it is sanitary (some other cities seem to have trouble keeping feces off of everything, but Seattle does well there) and often on time.
- DanielBMarkham 12y ago“So obviously they’re doing a lot of planning and engineering work to ensure that it will fit back in there,” he added. Anybody that's worked with engineers had to laugh at that. Yes, obviously they've done all the work they could possibly do. Otherwise they would be phonies. But I'll bet there's a huge difference between how this fine-detail work looks on paper an how it's actually going to happen.
- namlem 12y agoI bet they try to fit the new bit on at least twice before they get it to work properly.
- cromulent 12y agoThis animation shows the plan for fixing it. I can see why it will cost $125m. http://www.youtube.com/watch?v=QlPgkPo_vGQ http://www.youtube.com/watch?v=QlPgkPo_vGQ
- jpdlla 12y agoFor a second there I thought this had something to do with Bertha, the tropical storm. http://www.weather.com/news/weather-hurricanes/tropical-storm-bertha-20140801 http://www.weather.com/news/weather-hurricanes/tropical-stor...
- teamonkey 12y agoI couldn't help thinking about Bertha, the huge machine from the early '80s British children's TV series. http://youtube.com/watch?v=coZfzTcv4bA http://youtube.com/watch?v=coZfzTcv4bA
- Someone 12y agoMore likely http://en.m.wikipedia.org/wiki/Bertha_Krupp http://en.m.wikipedia.org/wiki/Bertha_Krupp, from there (disputed) to http://en.m.wikipedia.org/wiki/Big_Bertha_(howitzer) http://en.m.wikipedia.org/wiki/Big_Bertha_(howitzer), and from there to http://en.m.wikipedia.org/wiki/Big_Bertha http://en.m.wikipedia.org/wiki/Big_Bertha
- mdturnerphys 12y agoHere's the official namesake: http://en.wikipedia.org/wiki/Bertha_Knight_Landes http://en.wikipedia.org/wiki/Bertha_Knight_Landes
- jacobheric 12y agoI enjoyed the animations and videos of the repairs here: http://www.wsdot.wa.gov/Projects/Viaduct/About/followbertha http://www.wsdot.wa.gov/Projects/Viaduct/About/followbertha I spotted a UFO in the repair pit video, I'm curious if someone can identify it (upper left in the frame): https://www.youtube.com/watch?v=J4cCmM43IYk#t=91 https://www.youtube.com/watch?v=J4cCmM43IYk#t=91
- pgrote 12y agoIt appears to be a kite.
- PhasmaFelis 12y agoHow far did they get before jamming? If I recall correctly, with borers like this, they lay the concrete tunnel sections behind it as it digs, and the diameter of the finished tunnel is obviously smaller than that of the raw tunnel, which means you can't back it out without demolishing all of the tunnel sections you've already laid. The article doesn't mention any of that, unless I missed it. Were they "lucky" enough that the breakdown came before any concrete was laid?
- maxerickson 12y agoIt says that they made it 1000 feet. In the section describing the rescue, I think they mean it is going to move forward into the rescue shaft.
- deleted 12y ago[deleted]