So at the moment, there are no transformer spares. The outage would be 5-12 months to produce them and weeks to months for transport them and install them. Ev
by acqq 12y ago
So at the moment, there are no transformer spares.
The outage would be 5-12 months to produce them and weeks to months for transport them and install them.
Even with spares, the expected outage can be between weeks and months if the spares aren't near enough.
There are still no spares now.
From the conclusion:
"Since the 1989 Quebec storm and power outage, the Canadian government has invested $1.2 billion (about $34 per person) into protecting the Hydro-Quebec grid infrastructure, installing numerous blocking capacitors44. While these mitigation strategies can be expensive up front (estimated cost of $100k per blocking capacitor for a total of $100 million to protect the 1,000 most vulnerable transformers45), the cost of prevention is much smaller than the cost of the damage a single storm can create."
It seems only Canadians are doing at least something?