2 ms·
yeah, cooling systems are designed to handle a certain amount of heat per square foot. Most of the he.net locations around here can only handle 1 15a 120v circ
by lsc 17y ago
yeah, cooling systems are designed to handle a certain amount of heat per square foot. Most of the he.net locations around here can only handle 1 15a 120v circut per rack. That's 5 low-power dual-socket servers for a full-sized rack.
When I'm buying data center space I look at cost per watt and ignore the space requirements. I've not yet hit a place that was willing to sell me more power than I could use in a rack. If the space is low/medium density, I fill it with 2 or 3u chassis (I'm currently using http://supermicro.com/products/chassis/3U/833/SC833S2-550.cfm http://supermicro.com/products/chassis/3U/833/SC833S2-550.cf... because I got a good deal on a lot of them.) If it looks like they will sell me more power than I can eat with those, I pop in a few of the supermicro 2 in 1u boxes: http://www.supermicro.com/Aplus/system/1U/1021/AS-1021TM-T+.cfm http://www.supermicro.com/Aplus/system/1U/1021/AS-1021TM-T+....
This is part of why you see so many people leaving airspace between 1u servers. (me, I use the 3u servers for 'air gaps' as they run really cool.)