2 ms·
It's likely just an error in the design process that turns into a problem that is cost driven, but from the perspective that the problem was found after tooling
by serf 12y ago
It's likely just an error in the design process that turns into a problem that is cost driven, but from the perspective that the problem was found after tooling had been acquired and production started and would require a lengthy/costly recall procedure.