4 ms·
The biggest problem is when it turns into wagile development. they want to have a requirments document and an analysis and design document and then code and uni
by sharemywin 13y ago
The biggest problem is when it turns into wagile development. they want to have a requirments document and an analysis and design document and then code and unit test with QA all in 1 month instead of like 3 mo.