3 ms·
I'll just point out that according to the project's website, it has a capacity factor of 25%, for 71 MW.(Although it's probably much higher during the day, and
by trothamel 12y ago
I'll just point out that according to the project's website, it has a capacity factor of 25%, for 71 MW.(Although it's probably much higher during the day, and obviously much lower at night.)
http://www.cleanenergyactionproject.com/CleanEnergyActionProject/CS.Agua_Caliente_Solar_Project___Thin_Film_Photovoltaic_Solar_Power_Case_Studies.html http://www.cleanenergyactionproject.com/CleanEnergyActionPro...
- jdmichal 12y agoThat math works out pretty much perfectly with the listed "annual production" number: https://www.google.com/#q=(626.219+*+1000)+%2F+(365.25+*+24) https://www.google.com/#q=(626.219+*+1000)+%2F+(365.25+*+24)