3 ms·
This gives me major flashbacks to reading through the case study of London Ambulance Service's tech upgrade failure in 1991: http://www0.cs.ucl.ac.uk/staff/a.fi
by zyxley 13y ago
This gives me major flashbacks to reading through the case study of London Ambulance Service's tech upgrade failure in 1991: http://www0.cs.ucl.ac.uk/staff/a.finkelstein/papers/lascase.pdf http://www0.cs.ucl.ac.uk/staff/a.finkelstein/papers/lascase....
A lot of major points are shared:
- A vendor with no previous experience in the field
- Massive underestimation of project difficulty by the vendor
- No real oversight from the contracting organization
- A system meant to replace every preexisting process in one fell swoop
- Opposition from unions uncomfortable with replacing every preexisting process in one fell swoop