https://en.wikipedia.org/wiki/Citigroup_Center https://en.wikipedia.org/wiki/Citigroup_Center Earlier in May, LeMessurier met for an inquiry on another job whe
by stox 12y ago
https://en.wikipedia.org/wiki/Citigroup_Center https://en.wikipedia.org/wiki/Citigroup_Center
Earlier in May, LeMessurier met for an inquiry on another job where he mentioned the use of welded joints in the Citicorp building, only to find a potentially fatal flaw in the building's construction: the original design's welded joints were changed to bolted joints during construction, which were too weak to withstand 70-mile-per-hour (113 km/h) quartering winds. While LeMessurier's original design and load calculations for the special, uniquely designed "chevron" load braces used to support the building were based on welded joints, a labor- and cost-saving change altered the joints to bolted construction after the building's plans were approved.
Base of the Citigroup Center
View from the street
The engineers did not recalculate what the construction change would do to the wind forces acting on two surfaces of the building's curtain wall at the same time; if hurricane-speed winds hit the building at a 45-degree angle, there was the potential for failure due to the bolts shearing. The wind speeds needed to topple the models of Citigroup Center in a wind-tunnel test were predicted to occur in New York City every 55 years. If the building's tuned mass damper went offline, the necessary wind speeds were predicted to occur every 16 years.