4 ms·
An old construction contractor once told me that the proper way to estimate is to "take a wild guess, and then double it... and then triple it". Even with a lo
by atrilumen 13y ago
An old construction contractor once told me that the proper way to estimate is to "take a wild guess, and then double it... and then triple it".
Even with a lot of experience, the only thing that's really certain is that unexpected things tend to jump out and eat your budget.