4 ms·
Ca 0.50$ is actually only the Material cost. This number does not include cost for manufacturing, development, distribution, quality control, etc.
by kken 13y ago
Ca 0.50$ is actually only the Material cost. This number does not include cost for manufacturing, development, distribution, quality control, etc.