4 ms·
I wonder if a more open design approach would help them to build trust, increase quality and reduce expense. Rather than the team doing all the work themselves
by ximeng 13y ago
I wonder if a more open design approach would help them to build trust, increase quality and reduce expense. Rather than the team doing all the work themselves they could open up more data to outsiders to look at and spend more of their time on management. See italic points below. The more of the article I read, the more it sounds like by sharing information openly they could save massively.
" As the meeting ended, he noted that there was not enough time to vet the components that occupy the third floor: plans had to be gathered, specifications brought up to date, problems reconciled. “It is not reasonable,” he said. “It means that we would need to process thousands of data points in three weeks.” Chiocchio asked if things would speed up after early floors were finished, but there were simply too many details to work through before delivering drawings to the contractor. “We have no more float,” Cordier said. “If we delay now, we will have a real delay. The only way to avoid a schedule loss is to increase our resources to cope with it.”
That afternoon, Chiocchio joined me for lunch. He seemed exhausted. iter, by the time it is finished, will contain ten million individual parts, but he had only twenty-eight people working for him. He later showed me a room near his office where three men sit at workstations every day to hunt down conflicts. Before each man, there was the huge iter puzzle in miniature, filling up two computer screens. Up close, the design looked as though someone had taken the industrial landscape that runs alongside the New Jersey Turnpike and compressed it into a cube the volume of a Holiday Inn. “We have to check everything, from clashes to interfaces—like here,” one of the men said, pointing to a schematic where a support structure for the tokamak was not lining up with an embedment plate."