4 ms·
The release cycles for aerospace companies are a lot longer than in software. The previous A330 that they are talking about was originally released back in the
by branchan 13y ago
The release cycles for aerospace companies are a lot longer than in software. The previous A330 that they are talking about was originally released back in the early 90's. I assume Airbus didn't think it needed a full development system overall for incremental upgrades but believed it did when it came to designing a whole brand new airplane.