3 ms·
Uhhh, does that actually say what you want it to say? The summary of the chart in the second link is roughly: hours productivity product 40 100%
by saalweachter 13y ago
Uhhh, does that actually say what you want it to say?
The summary of the chart in the second link is roughly:
hours productivity product
40 100% 40.0
50 90% 45.0
60 83% 49.8
70 69% 48.3
So productivity per worker rises until around 60 hours per week, but productivity per worker hour is decreasing the entire way through.
What this means is that 60 hour weeks only make sense if your labor cost per worker is fixed, not your labor cost per worker hour. It doesn't make sense even without overtime pay, but if you're paying someone time and a half to work 60 hours a week, you're paying for 80 hours and getting 50 in return. You'd be much better off paying two workers for 40 hours a week each and actually getting 80 hours of work for those 80 hours you're paying for.
As an individual, working 60 hours per week regularly makes sense if you're a self-employed author and can't hire someone else to get the extra 10 hours of productivity, but if you're the average salaried slob working for the average company, it's a terrible bargain. You make the same pay, and the company gets 10 hours of extra work while you lose 20 hours of extra time. Why the hell would you agree to that?
- gte910h 13y ago>The Business Roundtable study found that after just eight 60-hour weeks, the fall-off in productivity is so marked that the average team would have actually gotten just as much done and been better off if they’d just stuck to a 40-hour week all along. And at 70- or 80-hour weeks, the fall-off happens even faster: at 80 hours, the break-even point is reached in just three weeks. http://www.salon.com/2012/03/14/bring_back_the_40_hour_work_week/ http://www.salon.com/2012/03/14/bring_back_the_40_hour_work_...
- yummyfajitas 13y agoI tried to follow the links in that article to primary sources and was not able to find a single one (though the article links to some blogspam for the Business Roundtable study). A search for the title of the original study did turn up this meta-study: http://www.danzpage.com/Construction-Management-Resources/Calculating_Loss_of_Productivity_Due_to_OT_Using_Charts_-_Nov_2001.pdf http://www.danzpage.com/Construction-Management-Resources/Ca... It has various narrow (i.e., really industry-specific) results that suggest you can have 6 week sprints of 50 hour weeks and gain productivity. Nearly all of it applies to construction. Overall, I'm still not understanding why people are so confident that 40 hours is the True Answer across all industries and all people, as is commonly asserted.
- gte910h 13y agoHere are some primary sources: http://micsymposium.org/mics_2011_proceedings/mics11_olson.pdf http://micsymposium.org/mics_2011_proceedings/mics11_olson.p... http://psychclassics.yorku.ca/Munster/Industrial/chap17.htm http://psychclassics.yorku.ca/Munster/Industrial/chap17.htm http://www.danzpage.com/Construction-Management-Resources/Calculating_Loss_of_Productivity_Due_to_OT_Using_Charts_-_Nov_2001.pdf http://www.danzpage.com/Construction-Management-Resources/Ca... https://www.construction-institute.org/scriptcontent/more/sd43_more.cfm https://www.construction-institute.org/scriptcontent/more/sd... http://classes.engineering.wustl.edu/2009/spring/jme4900/Articles/COEModificationImpactEvaluationGuide.pdf http://classes.engineering.wustl.edu/2009/spring/jme4900/Art... http://cmdept.unl.edu/drb/Reading/overtime2.htm http://cmdept.unl.edu/drb/Reading/overtime2.htm
- yummyfajitas 13y agoAwesome I'll take a look.
- yummyfajitas 13y agoPerhaps, but if the same conclusion holds for salaried workers outside construction (huge if, obviously), then you do want 60 hour weeks. The hourly case is also made more complicated by benefits. The only thing I'm actually trying to say is that I don't know the right answer and I'd love it if all the people who do seem to know the right answer would cite some sources.