That's not really an accurate picture of net metering. The terms of almost every net metering plan are in the power company's favor, even if the net meterers s
by brownbat 13y ago
That's not really an accurate picture of net metering.
The terms of almost every net metering plan are in the power company's favor, even if the net meterers somehow never bought power.
Net metering, as currently implemented, only allows you to earn credits on your bill up to the point where your maintenance fee kicks in. You're earning credits by producing power for the company during the day, when power is expensive. You're burning those credits to keep the lights on at night, when the company's cost of power is nonexistent. No one is paying net meterers market rate for time of day, so the power companies are coming out way ahead on cost of power. Even if that weren't the case, they still baseline your bill to a maintenance fee.[1]
Moreover, Hawaii has never had any clue how to balance a grid, so if HECO is now blaming customers for problems with the terrible system they built, my default position is skepticism.
[1] HECO's net metering bill guide, including the minimum monthly fee even for no power use:
http://www.heco.com/vcmcontent/EnergyServices/NetEnergyMetering/Understanding_Your_NEM_Bill_Summary_Brochure_FC.pdf http://www.heco.com/vcmcontent/EnergyServices/NetEnergyMeter...
- brownbat 13y agoI'm really pulling for a neighborhood microgrid movement in areas with abundant solar, terrible power monopolies, where a bank of vanadium batteries is overkill for one house. Don't get me wrong. Only some power companies are awful monopolies that barely do their job, most work fine. Still, those awful monopolies should face some threat of revolt.
- masklinn 13y ago> I'm really pulling for a neighborhood microgrid movement in areas with abundant solar This is a nice scheme around and between the tropics, and just about nowhere else. Because you need not just abundant sun, but abundant sun year round.
- brownbat 13y agoGermany's already getting a lot out of the source with terrible insolation. Temperate areas would need to lean on storage more. As generation efficiency increases, storage losses matter less. As storage technologies improve, poor insolation matters less. But sure, someone invents a nice kitchen-sized baseline reactor that anyone can run, then this microgrid movement really takes off. Probably not in the next couple weeks. ;)
- el_g 13y agoUtility reliability requirements are set by PUCs and Federal Regulators. Unless the neighborhood microgrid is always islanded from the grid, there are quite a few problems to solve: 1) Who will respond to outages and make repairs. This includes issuing clearances to crews making repairs. 2) Who will issue protection settings (reclosers/relay settingsfuse coordination, etc) and perform fault analysis? 3) Unless you have generators then they'll need to provide power when your PV systems don't meet demand 4) Someone needs to investigate power quality problems 5) Generation dispatch to meet demand and maintain a system frequency of 60Hz. 6) Someone must handle interconnection requests. Who is going to stop your neighbor with a 50Hz generator that can handle 50% of your microgrid load from connecting to the system, causing a big frequency drop and damaging appliances? Your microgrid doesn't have enough inertia to absorb something something like that. 7) Are the micro grid operators subject to the same reliability requirements as utilities? 8) Are you going to install your own poles and wires? That includes permitting, responding to joint use requests per regulatory requirements, etc.
- brownbat 13y agoSome of these issues are created by the bulk power system model. For example, heavy industry and long distance transmission require much more precise balancing than neighborhoods. Others can be financed in the same way that HOAs finance capital improvements, or the same way tenants of an apartment benefit from the use of a building and maintenance crew they could never afford to build or have on retainer individually. Others would be obvious how to resolve in practice (ie, How do you prevent your neighbor from wrecking the system? Well, how do you currently prevent your neighbor from hooking up his pipes to the neighborhood fire hydrant? A combination of common sense regulations and social mores.) If our default position were microgrids, we might wonder of a unified system, "but how would you prevent cascading blackouts?" The current answer is you don't, major cascades just happen around once a decade. It's all a series of tradeoffs, and I agree with you, usually the tradeoffs favor bulk generation. The balance shifts when monopolies abuse the public trust. So here, things like load balancing are an interesting example, since that's not an area where HECO has always excelled. UCSD is using a microgrid because they can't achieve sufficient reliability from California's bulk power system: http://www.bloomberg.com/news/2013-10-17/ebay-to-ellison-embrace-microgrids-in-threat-to-utilities.html http://www.bloomberg.com/news/2013-10-17/ebay-to-ellison-emb...