4 ms·
I don't know about net metering, but you can build a serviceable system with 12 volt PV cells, recovered UPSs, and some lead-gel batteries (which you should sto
by spiritplumber 13y ago
I don't know about net metering, but you can build a serviceable system with 12 volt PV cells, recovered UPSs, and some lead-gel batteries (which you should store outside). You can use car alternator diodes for overvoltage protection. Should I draw a schematic?
- jzwinck 13y agoI don't think a schematic is going to solve the problem at hand. It's more of a local political issue.
- spiritplumber 13y agoTrue. I was just referring to reducing the price of ancillaries.