3 ms·
Window damage on Atlantis threatens six month delay to STS-129
- dougp 17y agoWow, they are very thorough.
- TrevorJ 17y agoI felt like I was reading something from "The Onion". On the one hand, they are drawing up schematics of the nob and it's placement, along with boroscope inspection of the damage. On the other hand they reference using Loctite as a vital part of the install process.