4 ms·
I honestly have no idea how complicated building a plane can be. What I designed required zero plane building knowledge. But given how long it takes and expensi
by micks56 17y ago
I honestly have no idea how complicated building a plane can be. What I designed required zero plane building knowledge. But given how long it takes and expensive it is, I think it is more difficult than it looks. There are technical difficulties, and then there are difficulties in dealing with massive, distributed teams. The second one increased problems managing the first, which is why we read that article today.
Two of the main design constraints for planes are weight, and its close close relative, fuel efficiency. Consider those as important as actually being able to fly.
The whole reason my project existed was to reduce weight and increase fuel efficiency. What made the critical component I talked about difficult to make was that it needed to be much more efficient than any of its type ever made before. Its efficiency would allow for less operating current, which would reduce the wire gauge needed throughout the plane, reduce weight by 1000s of pounds, and therefore save many gallons of fuel.
It also allowed for another fuel efficiency gain; It reduced the number of systems operating via air or hydraulics. The air comes from the engine after the compressor stage but before fuel is added. These systems are inefficient because the air from the compressors is very hot and it must be cooled before use. That cooling operation takes electricity, and therefore wastes energy when compared to a system that just used electricity from the start.
I should add that the critical component is not a discrete one like a transistor or resistor. Rather it is a system of its own, like a power supply is a system of its own, but we can buy one and as an engineer consider it a single component.
I don't know Boeing's rationale for TV commercials either. It could be anything from putting the Boeing name in front of Americans for American pride when competing against European Airbus. Or maybe they know that the decision maker at a key potential customer loves NFL football, and Boeing blanketed his hometown team with ads during the games. Maybe the marketing department wanted to use up their yearly budget.
Whatever the reason is, when hundreds of billions of dollars in orders are at stake like this, the ads aren't directed at people who purchase plane tickets. I am guessing the ads are out there to make sure that every plane purchasing decision maker absolutely knows that the 787 exists and that they should buy it, and making sure that every member of Congress (and their constituents) absolutely knows that the 787 exists and Americans should support it, as opposed to Airbus.
- quizbiz 17y agoThe thought entered my mind to short $BA after reading this when you posted it. Today, Boeing made the delay official and the stock dropped 7% right at opening. http://money.aol.com/rtn/pr/boeing-postpones-787-first-flight/rfid225559631?channel=pf http://money.aol.com/rtn/pr/boeing-postpones-787-first-fligh...
- micks56 17y agoI wish I checked the date on the Portfolio article. I didn't realize it was for the May issue. In Boeing's recent statement they said they need a few weeks to determine the length of the delay. It is not a good sign when it takes weeks to find out how far behind you are. Prediction Number 2: For every week it takes Boeing to release an updated schedule, the delay will be 1-2 months. I think it will take Boeing 2-3 weeks to release a statement, so that means somewhere between 2-6 months delay. I'll take 6 months. Boeing lost about $3B in value yesterday and today. Boeing margin on planes is a maximum of about 6%. To me, this means Wall Street thinks about 250 planes (or more) are now delayed. I figured that out by solving $3B / 6%, which is total revenue expected by Boeing when profits are $3B. I took that number and divided by $200MM, which is the approximate sales price per plane. That comes out to be 250 planes (which would result in $3B profit). Boeing says they would be able to produce about 10 planes per month, eventually ramping up to 16. That means it takes about 2 years for Boeing to make 250 planes. Checking my numbers, I said a 6 month delay, then there will be 1 year of testing, and then Boeing can start manufacturing. So I predicted somewhere over 18 months, assuming no further problems (yeah right), while Wall Street predicts around 2 years, pending further statements. Prediction #3: First non-test version 787 delivered to a customer Fall 2011. I may regret that prediction later in life. :)
- prpon 17y agoThank you for your insight. "Much work needs to be done before we announce to the world that much work needs to be done"