4 ms·
> Whoever they got to do the power system for their new Utah site ... failed rather hard. Can you elaborate on this?
by hanley 13y ago
> Whoever they got to do the power system for their new Utah site ... failed rather hard.
Can you elaborate on this?
- hga 13y agoFrom memory there are regular power disruptions that cost "$100,000" each time. Now checking with Google: https://www.google.com/search?q=nsa+utah+power https://www.google.com/search?q=nsa+utah+power I see/remember this is delaying the opening of the site.
- zackelan 13y ago> The report blames the NSA “fast tracking” the Utah project and thus bypassing “regular quality controls in design and construction.” http://www.forbes.com/sites/kashmirhill/2013/10/07/the-nsas-hugely-expensive-utah-data-center-has-major-electrical-problems-and-basically-isnt-working/ http://www.forbes.com/sites/kashmirhill/2013/10/07/the-nsas-...