3 ms·
Knowing a bit about estimating construction, and a bit more about the estimating of design which is more akin to software, there's more to the ability to execut
by brudgers 13y ago
Knowing a bit about estimating construction, and a bit more about the estimating of design which is more akin to software, there's more to the ability to execute according to a time table than the author gives credit...and the fact that the process can be separated between design and construction gives a clue.
Mature processes for delivering construction start with a budget and something called a program - an architectural program being a design and implementation independent description of the project's components and the relationships among and between those components.
Then there is the matter of age. Architects aren't worth a shit until they hit about sixty. Those running big designs have decades of experience. In the US the median age for initial licensure is 33. It's not twenty-something's freshly out of college, or even parents with grade schoolers organizing the process.
Then, in the US, there tend to be standard contracts which describe industry standard milestones and acknowledge that nobody really knows how things will change over what is often a multi-year cycle. Buildings are delivered reasonably on time and within budget because the process of contracting for the work doesn't require reinvention - even the plumber's subcontract is a standard form and tied to CSI format specifications which are tied to industry standards and to ANSI materials standards and the building codes.
Nobody roles their own using the coolest new fad. It's Java, not Haskell. If you read Hamurabi, you'll see the source of those traditions.
- wpietri 13y agoThe software process can not actually be separated into design and construction. Software is a 100% design activity. Construction is what our compilers and installers do. Projects that appear otherwise have created artificial barriers to prevent certain kinds of design at certain times. You're also missing that repeatability in software is a sign of waste. If developers are doing things that are truly well-understood and predictable, then they're doing something wrong. They should download a library or extract a framework, automate the predictable parts, and shift their attention to something worthwhile.
- brudgers 13y agoAs an architect, my business is 100% based on estimating my design time. Within that design time I also estimate construction time. What allows me to do both is not only my personal 20+ years of relevant experience, but also the collective experience of the industry and design methodologies that reflect that experience. I.e. architectural designs are delivered in moderately well understood stages of increasing concreteness and there is an established language for communicating designs to clients (plans, renderings, project manuals). Furthermore, repeating the same operations in the design of a building is no less a waste than in the design of software. The same may be said for actually constructing a building. Programmers have no monopoly on the ideal qualities of laziness, impatience and hubris. It's just through experience that I have learned that at some point the nail gun has to come out if the plywood is to go up. Or the pencil gets put to paper if there's going to be a design - and note that it is not uncommon for good designers in the software world to start on the drawing board not the computer. And this, I think gets at some of why people have so much trouble estimating software. They start designing the building having already decided on its structural system and hvac layout and light switch locations. Choosing Django over Rails over ASP.NET before diving into the problem means that the tool has to be made to fit the job rather than delaying that decision. Now, I'm not suggesting that this is always the case. But to put the difference in collective and individual experience in perspective, one of my mentors [a formal mentor as part of the formal process of becoming licensed as an architect] was Ronn Ginn, an architect known locally but not somebody anyone has heard of. Anyway, Ronn is still practicing. He started practicing before there was FORTRAN. Think about how many Ask HN's there have been based on the idea that 28 is too old. Frank Gehry, who you probably have heard of, is about the same age. His first project to receive any sort of attention came when he was 42 in 1971. He was nearly 70 when Bilbao gave him international fame.