Software Development Estimates: Where Do I Start?
- swanson 13y agoMost people would agree that practice makes perfect, right? I think a big issue with software estimation is that it is hard to get practice. I'd done full project estimates for 4-6 projects in 3 years of working professionally. Compared to the amount of practice I have writing code, this is nothing. How can I ever hope to get good at something if I only do it once every 3-6 months and it might take 2 years to get feedback on if my final number was close to the actual cost? And unlike other skills, I can't practice on my own or take a course (I've never seen an open source project that did round-trip estimates, maybe that's something to try out...) Another issue is when you have an "indirect estimate" - basically I will estimate the work, but someone else is the one that ends up doing the project. If you aren't careful to consider who will be doing the work, you might estimate too low (if you are an expert and the work is done by a bunch of new hires). And none of this even touches on misinterpreting client demands, scope creep, dev team turn-over, or often neglected timesinks like documentation and meetings.
- jacques_chester 13y agoPerhaps you could try scaling estimation down, instead of up. For example, in the SEI's Personal Software Process you estimate very frequently. Like agile, it works by attacking big problems in lots of small pieces. So instead of just doing the 4-6 whole-of-project estimates, you can also do estimates for stories, estimates for modules and so on. The other thing to consider is re-estimating as you go. The Cone of Uncertainty demonstrates that as a project progresses, uncertainty about the problem and solution domains diminishes and so estimates can be made with tighter ranges.
- cs02rm0 13y ago> Most people would agree that practice makes perfect, right? Probably, if you're building the same software system, over and over. If you're building a different one, no I shouldn't think it does.
- losethos 13y agoI made 130,000 lines in ten years. In the last 3-4 years, I've been idle, mostly, but for the first 7 years, I worked long hours. It isn't very difficult code, but simplicity is genius. God says... Gift falsely OF Blessedness pardon_the_french belly assiduously
- zackbloom 13y agoMy key advice is to not pay attention to the minutia of the task, if you do you'll always underestimate. A better method is to forget the specifics and ask yourself 'If a buddy told me he was doing this, how long would I guess it would take?'. We have more experience hearing about projects and how long they took then we do really estimating the duration of creative tasks by reduction.
- louthy 13y agoThis is finger-in-the-air approach, which seems doomed to fail. For a start, it relies on your buddy having exactly the same career experience as you, and any new project being an almost exact match to previous projects you have worked on. It doesn't take into account the unknowns, and doesn't break the task down into components that you could at least attempt to quantify. Personally I go through a short mental breakdown of the project, trying to partition it in my mind into smaller jobs. Based on my years of experience I will then have a gut feeling for certain aspects of the project. If any job is more than 3 days long, then I try to break it down further. If I can't mentally break it down, then I need to spend some time researching why that is (investigate the unknowns). Once everything has been broken down, and I have reduced the unknowns as much as possible I add contingency. Anything that I feel has the potential to be problematic I will add more contingency to, or add additional research time.
- rogerbinns 13y agoI address the problem by giving a range. Giving a single number is the real problem. For example I might estimate something as two weeks plus/minus six weeks, or a month plus/minus a week. That range is because of the usual factors (scope creep, things that have never been combined before, testing, meetings, holidays etc). Sometimes the questioner picks up on the two weeks minus six weeks is a negative number. I then explain that existing functionality could be used, goals could be achieved in other ways, or maybe it just isn't really needed.
- philbarr 13y agoOne thing my Dad always told me about software estimates: "Take the estimate, double it, and increase the time unit by one. So if they tell you it's a couple of days effort, that's really four weeks..."
- dugmartin 13y agoI came here to say this. I think there is more than a kernel of truth in it - it helps you remember that effort almost always never equals duration.
- yannis 13y agoUse the pi rule. Multiply the estimated duration by pi. Works for many other things too, besides software.
- arethuza 13y agoMultiplying by a value between 3 to 4 seems pretty common - the explanation I've heard being: - One to work out what you should be building ("I have to tel you what I want? I might as well build it myself") - One to build it - One to get in working in the required way (allowing for "That may be what I asked for, but it's not what I want") And a bit more for contingency... NB The above approach is based on an assumption that the real difficulties come from working out what to build - technical risks are generally easier to address (prototypes etc.).
- DanielBMarkham 13y ago"...The gist of why estimates are hard: every new piece of software is a machine that has never been built before..." Yes, and that's why a lightweight, repeatable estimation process beats every other way of doing it. As you continue to estimate, you create and refine a mental model of the project's complexity. For some projects, you're able to create a mental model that has high fidelity quite easily. For others, it takes a bit of work. The entire article here was an exposition on this fact. Some folks figure that out and want to just give up. Estimation is impossible! Other folks, however, are going to figure it out if it kills them. What happens in these cases is they start to list every possible variable that could be involved in such a model in every scenario, and then create one uber, ultimate, super model that works in all situations. Over time and through lots of trial and error, both approaches have been found to be bullshit. Instead of giving up, or creating more and more complex models that take more and more time to work, with each project you're better off starting with the most ludicrously simple model you can and then adding complexity as needed. The trick is incremental complexity, repetition, and convergence. If you have that nailed, the details of your actual model, oddly enough, do not matter that much. Obligatory link to previous comment: https://news.ycombinator.com/item?id=6389227 https://news.ycombinator.com/item?id=6389227
- jacques_chester 13y agoI agree that the estimation process needs to be tuned to fit the local context. There's no point building a 50-parameter statistical model for building a 3-page website. But likewise, SWAGs aren't appropriate for megaprojects. A more involved process is called for.
- wpietri 13y agoOr one can just not do megaprojects. An instructive example comes from one of Mary Poppendieck's books. The Empire State Building was never planned and estimated in the traditional sense. They picked a deadline and used a flow-based approach to make it happen. They were already building the lower floors before the upper floors were designed. One of the problems they faced was that nobody had designed an electrical system nearly that size. So they split the building down the middle vertically and in three slices horizontally. That gave them 6 30-story buildings to wire, an understood problem. Another good example is the Internet: a globe-spanning network that connects a large fraction of humanity. There is no central control, no central design, no plan. Much larger than any megaproject, but done without a megaproject's methods. I agree that megaprojects use more involved methods, but I think "called for" is, as yet, unproven. I think it's more about the people and the social structures making the decisions than it is about what's being created. When all you have is primates, everything looks like a primate dominance hierarchy.
- ollysb 13y agoI think the problem is that developers(including myself) tend to make estimates assuming that they're not going to find anything that makes them say WTF! Code is never perfect and it's extremely difficult to know how much time it's going to take to dissect and restructure code to accommodate your new feature.
- jacques_chester 13y agoThis is called optimism bias -- when estimating, we forget the things that can go wrong.
- DanielRibeiro 13y agoA gret book on that is Agile Estimating and Planning by Mike Cohn[1]. Having that said, there has been a lot of controversy on the value of estimates recently: Estimation is Evil[2] Purpose of Estimation[3] I believe their TL;DR comes from the second one: For me, estimation is valuable when it helps you make a significant decision [1] http://www.amazon.com/Agile-Estimating-Planning-Mike-Cohn/dp/0131479415 http://www.amazon.com/Agile-Estimating-Planning-Mike-Cohn/dp... [2] http://pragprog.com/magazines/2013-02/estimation-is-evil http://pragprog.com/magazines/2013-02/estimation-is-evil [3] http://martinfowler.com/bliki/PurposeOfEstimation.html http://martinfowler.com/bliki/PurposeOfEstimation.html
- rrhyne 13y agoAlways provide two quotes, the "shoot the moon" and the budget quote. The client will always cherry pick segments from the more expensive quote to arrive right at their budget. You can still loose to the next guy, but if you are in the ballpark, it won't be because you came in (a little) too high with this approach.
- jacques_chester 13y agoMy favourite book on software estimation is McConnell's Software Estimation: Demystifying the Black Art. As usual he takes a vast body of literature and boils it down into a chatty, usable book. The tables and checklists are worth the sticker price on their own.
- do-it-good 13y ago"As usual" for what - a book, the author, a book series called Demystifying the Black Art ?
- jacques_chester 13y agoAs is usual for McConnell. All his books are excellent.
- jacques_chester 13y ago> The gist of why estimates are hard: every new piece of software is a machine that has never been built before. I am tired of the argument that we unique snowflakes amongst all professions and that consequently we deserve special treatment. We aren't. All professions deal with uncertainty and most of them deal with it deliberately[1]. Throwing your hands in the air because a perfect prediction is impossible is just silly; an estimate is by definition an uncertain statement of an unknown variable. Estimating software can be difficult because there are many points at which complexity can be multiplied (McConnell's example of the requirement "validate phone numbers" shows a span of minutes to months)[2]. But when you see very wide ranges on an estimate, it's a signal that the problem is poorly understood. Outside of genuinely novel research, improving estimation accuracy is possible and valuable. And how often do we invent publishable new algorithms for graph traversal? I have skin in the estimation game, as I am currently developing a tool for performing estimates[3]. I've also been researching the topic of estimations generally. I'm mostly amazed at how people in my profession try it once, get an inaccurate result, and then decide -- "That's it! It's impossible! I tried it one time and it didn't work!". If you go into a gymnastics club and you can't do a backflip, that doesn't mean backflips are impossible in principle. It means you can't do it. Estimation is a skill too. [1] See Petroski's To Engineer is Human, I reviewed it here: http://chester.id.au/2013/07/07/review-to-engineer-is-human-the-role-of-failure-in-successful-design/ http://chester.id.au/2013/07/07/review-to-engineer-is-human-... [2] In Software Estimation: Demystifying the Black Art. [3] http://confidest.com/ http://confidest.com/
- contingencies 13y agoIf you go into a gymnastics club and you can't do a backflip, that doesn't mean backflips are impossible in principle. It means you can't do it. Estimation is a skill too. Cute metaphor, but I'm calling bullshit. Fundamentally, if something is completely new, sometimes nobody knows if it's even possible. Granted, that's almost never the case for software algorithms. But holistically speaking, in real software-centric systems, it happens: particularly when hardware, delivery, external system integration, some form of regulation, unique knowledge individuals, utilities, or any other form of third party are involved. In the real world, people truck on anyway with relative confidence and frequently reform an informal estimate along the way. The waterfall model sux. Estimates are perhaps for many software projects tied to waterfallesque models and the idea of that most loathed of middle-managers; the non-technical project manager[1]. Perhaps with the 'agile' trend we're finally shifting beyond that. A valuable insight from a project management perspective might be We can't realistically estimate[2] this; or even know if it's possible but a software person can do that rapidly and without wasting time hiring a project manager to estimate[2], and a backup can be prepared and/or developed in tandem. [1] http://www.urbandictionary.com/define.php?term=project%20manager http://www.urbandictionary.com/define.php?term=project%20man... [2] http://www.urbandictionary.com/define.php?term=estimate http://www.urbandictionary.com/define.php?term=estimate
- brudgers 13y agoKnowing a bit about estimating construction, and a bit more about the estimating of design which is more akin to software, there's more to the ability to execute according to a time table than the author gives credit...and the fact that the process can be separated between design and construction gives a clue. Mature processes for delivering construction start with a budget and something called a program - an architectural program being a design and implementation independent description of the project's components and the relationships among and between those components. Then there is the matter of age. Architects aren't worth a shit until they hit about sixty. Those running big designs have decades of experience. In the US the median age for initial licensure is 33. It's not twenty-something's freshly out of college, or even parents with grade schoolers organizing the process. Then, in the US, there tend to be standard contracts which describe industry standard milestones and acknowledge that nobody really knows how things will change over what is often a multi-year cycle. Buildings are delivered reasonably on time and within budget because the process of contracting for the work doesn't require reinvention - even the plumber's subcontract is a standard form and tied to CSI format specifications which are tied to industry standards and to ANSI materials standards and the building codes. Nobody roles their own using the coolest new fad. It's Java, not Haskell. If you read Hamurabi, you'll see the source of those traditions.
- wpietri 13y agoThe software process can not actually be separated into design and construction. Software is a 100% design activity. Construction is what our compilers and installers do. Projects that appear otherwise have created artificial barriers to prevent certain kinds of design at certain times. You're also missing that repeatability in software is a sign of waste. If developers are doing things that are truly well-understood and predictable, then they're doing something wrong. They should download a library or extract a framework, automate the predictable parts, and shift their attention to something worthwhile.
- brudgers 13y agoAs an architect, my business is 100% based on estimating my design time. Within that design time I also estimate construction time. What allows me to do both is not only my personal 20+ years of relevant experience, but also the collective experience of the industry and design methodologies that reflect that experience. I.e. architectural designs are delivered in moderately well understood stages of increasing concreteness and there is an established language for communicating designs to clients (plans, renderings, project manuals). Furthermore, repeating the same operations in the design of a building is no less a waste than in the design of software. The same may be said for actually constructing a building. Programmers have no monopoly on the ideal qualities of laziness, impatience and hubris. It's just through experience that I have learned that at some point the nail gun has to come out if the plywood is to go up. Or the pencil gets put to paper if there's going to be a design - and note that it is not uncommon for good designers in the software world to start on the drawing board not the computer. And this, I think gets at some of why people have so much trouble estimating software. They start designing the building having already decided on its structural system and hvac layout and light switch locations. Choosing Django over Rails over ASP.NET before diving into the problem means that the tool has to be made to fit the job rather than delaying that decision. Now, I'm not suggesting that this is always the case. But to put the difference in collective and individual experience in perspective, one of my mentors [a formal mentor as part of the formal process of becoming licensed as an architect] was Ronn Ginn, an architect known locally but not somebody anyone has heard of. Anyway, Ronn is still practicing. He started practicing before there was FORTRAN. Think about how many Ask HN's there have been based on the idea that 28 is too old. Frank Gehry, who you probably have heard of, is about the same age. His first project to receive any sort of attention came when he was 42 in 1971. He was nearly 70 when Bilbao gave him international fame.
- airlinenut 13y agoSome additional notes/suggestions on estimation on Stackexchange: http://freelancing.stackexchange.com/q/495/67 http://freelancing.stackexchange.com/q/495/67
- jwilliams 13y agoThere is a way to get a perfect estimate - and that is to build it and see how long it takes. Everything else is using an abridged model is short-cut the process. However, I think this is an important point. Estimating is somewhat akin to actually building the end-product. The reason I find this important is that the most common spiral of death I see is re-estimation. You take on something unrealistic, plough on regardless, realise too late, then you re-estimate. The re-estimation causes a project stall and takes time. The end result being you have less time.. Few months later you're in the same boat again (repeat).. Big organisations are really prone to this.
- jacques_chester 13y ago> There is a way to get a perfect estimate - and that is to build it and see how long it takes. The concept of a "perfect estimate" is tautological, isn't it? Estimates are by their definition uncertain statements.
- wpietri 13y agoI believe that's his point.
- jacques_chester 13y agoThen the larger point is that if estimates are always imperfect, we need to stop obsessing about their always being imperfect.
- jwilliams 13y agoYeah, more or less :) I think admitting/deciding upfront what you want to be imperfect is a good start.
- wpietri 13y agoMy main trick these days for this problem is to discourage estimation by pointing out the costs of it and putting the burden on the requesters. One great way to do that is to release early and often, allowing stakeholders to change plans in response to what they've learned. Instead of doing the work of (re-)estimating a bunch of stuff every week, their focus on what's actually going on lets them stop obsessing about arbitrary dates and semi-fictional plans. People very rarely need estimates. They want a sense of control. They want to manage risk. They want to convince people that money is being well spent. They want to avoid looking like fools. If you solve those problems without using estimates, people generally stop caring.
- swanson 13y agoI agree with that estimates are largely about a [false] sense of control, but this is a tough sell when dealing any company with budgets and stakeholders that have to go ask their boss for a finite number of dollars to trade for software. Often times, this is a one-time ask. You get money allocated once, so you better get enough to build the whole thing. You can't go back and say, "hey boss! look what we got with the first $10k, can I have $10k more?" If you are a startup or dealing with a 4-figure project from a local business, then sure, you can probably skip estimates.
- robinhoode 13y ago> Often times, this is a one-time ask. You get money allocated once, so you better get enough to build the whole thing. You can't go back and say, "hey boss! look what we got with the first $10k, can I have $10k more?" This is an area where software engineers who've made serious profits and turn around to become investors have an edge over traditional that do not understand the levels of risk involved with large software projects. Explaining the granularity in the types of risk that are involved is complicated to people that expect to write a check once and have a finished product come out of it.
- wpietri 13y agoSure, but that's an artifact of traditional budgeting. In the Lean world (as in Lean Manufacturing), traditional budgeting is considered a dangerous and misleading activity. Another way to work it is to have a backlog of valuable things to do that get handed out to teams. When somebody needs something to do, you pick the highest-ROI project from the backlog and give it to them. In that context, detailed specs and careful estimates generally turn out to be wasteful. If you're trying to pick projects by expected ROI, then making the software estimate more precise than the (generally handwavey) business value estimate is pointless.
- gte910h 13y agohttp://www.amazon.com/Software-Estimation-Demystifying-Practices-Microsoft/dp/0735605351 http://www.amazon.com/Software-Estimation-Demystifying-Pract... is fantastic for giving many approaches to the topic, and counseling for non-technical stakeholders where it isn't a negotiation, but math.
- xarien 13y ago"The gist of why estimates are hard: every new piece of software is a machine that has never been built before." This statement is simply not true. Every new piece of software can be broken down to pieces that are very similar to other software that had been done before. This is actually the secret to providing a good estimate. What generally screws up estimates are complications that arise. Much of it actually has to do with pre-existing code as opposed to new code. If you were to build something from scratch and had a team of experienced engineers, I'd bet that you'd get a pretty damn accurate estimate.
- strictfp 13y agoOne could argue the same for buildings: "Every newly designed building is simply composed of known elements: columns, pillars, windows, tiles etc". The composition _is_ the innovation.
- dreamfactory 13y agoDisagree entirely. If "Every new piece of software can be broken down to pieces that are very similar to other software that had been done before", you are talking about assembling library components, not programming (though as you say even that often comes with its own unforeseeable difficulties). This is the fundamental paradox of software development estimation (and separate to the uncertainty of external forces): when you try to estimate development you are estimating design of something that has never been made before. If you aren't, you should probably be buying a product instead of building. It's a fool's errand basically.
- known 13y agoGood judgement comes from experience. Experience comes from bad judgement.
- biot 13y agoAn analogy I like to use: "Here's a book of sudoku / crossword puzzles. How long would it take you to solve all of them?" Estimating this is similar to estimating a software system. You've seen puzzles like them before, but you don't know the difficulty level of each or which ones have tricky clues that cause you to rack your brain trying to find the solution. It also nicely illustrates the 10x effect: some puzzle solvers breeze through them while others take forever. If you could break a software system down into a rigorous formal specification that could be precisely estimated, it would be possible to use that specification to build it automatically. Then that shifts the estimation up the ladder of abstraction to one where you estimate the time to create the rigorous formal specification.
- jacques_chester 13y agoSuppose you're asked to estimate a single sudoku problem. That's basically impossible, because n=1. In small samples from a large population, variation is enormous. But what if I ask you to estimate the time for 100 sudoku problems? For 1000? What if, after 2 years of solving sudoku problems full time I ask you for your estimate? What if I develop simple statistical models based on the number of squares that are already filled in? Already it has become possible to improve your estimate, to make it more accurate. The value of an estimate is balanced on the line between the cost of its uncertainty and the cost of its development. Over time, for any class of problem, the cost of developing estimates falls.
- jbrechtel 13y agoDefinitely true that estimates can be improved from some hypothetical floor of quality.. Estimates still come with a cost in themselves though. They're not an end, merely a means. So we should consider alternatives. An alternative approach I've heard from some teams, though haven't had the pleasure of trying myself, is to break your work into similarly sized small chunks and measure team speed over time in terms of these chunks. This sounds a lot like relative point based estimation often seen on agile teams. However, the difference is that once you establish this sizing rhythm during analysis (with the help of estimation early on to hone in on sizing) then you skip estimation altogether. I suspect this needs to be calibrated from time to time ("our stories have gotten too big") and exceptions need to be made (e.g. "there's just no way to split this work up and keep it releseable") but those scenarios are exceptions, not the norm. A world without estimates sounds great to me.
- alok-g 13y ago>> "The gist of why estimates are hard: every new piece of software is a machine that has never been built before." What is not explicitly said here is that a good developer needs to know what would be a "new" piece of software. He should be at least vaguely aware of what has been built already, what is within the reach of the state of the art, etc. And just like in the stock market, it is impossibly hard to know all the needed information to come up with wise judgement, complicating the estimation process even more. Yet, this is an essential piece in estimation anyways. Just for example, for some projects you may simply declare them to be beyond the state of the art.
- molson8472 13y agoI really like this statement: "Every new piece of software is a machine that has never been built before. The process of describing how the machine works is the same as building the machine." That's probably the best way of relating the problem to non-engineers that I've heard.
- bcantrill 13y agoCompletely agreed -- and I hit on the same themes on a talk on software engineering management (and its pathologies) at Surge on Friday[1]. The date fetishization so common in software engineering management is a direct result of non-technical management, who do not understand that every piece of software is solving a heretofore unsolved problem (even if a teensy tiny one) -- and that the unknowns often cause software to take much longer to build than one would anticipate. This gives a kind of CAP analogue for software: schedule, quality, features -- pick only two. [1] http://www.slideshare.net/bcantrill/surge2013 http://www.slideshare.net/bcantrill/surge2013
- jlebrech 13y agoMinimum of 2 weeks for anything you think might take more than 4 days, if it's a day then double it. etc.
- annnnd 13y agoNot sure where I first heard this (and it applies more to single developers), but I find this very true: when estimating the time needed to perform something, try imagining how much time ANOTHER person would need. In general we underestimate the amount of work when thinking in first person; we are much more accurate when assessing the ability of others.
- forgotAgain 13y agoDoes the customer understand what they are asking for? Can they afford it?
- grantph 13y agoI ALWAYS quote fixed price projects regardless of scope. Some software engineers would say that's highly risky. For me, it tends to be highly profitable because my estimates are usually accurate. If anything, I've learnt to over estimate and impress clients by delivering on promises. I am amazed by the number of people who try to portray computer science as a pseudo science like voodoo, where estimates are impossible because the problems are unknown. Just because information is abstract doesn't make it any more difficult to estimate than something physical. Computer science IS a science and software engineering IS engineering. Good engineering involves breaking problems down into small manageable pieces that are easily understood then planning how to implement them. This practice is called design. On more complex projects it's architecture - a sexier form of design. Let's get back to basics. Who has heard of "the software development life cycle"? Everyone, I hope. It's modeled off something from the early 19th century called the product development life cycle. It needs to be mentioned because IT people like to think they're special and mysteriously invented SDLC. Feasibility, analysis, design, development, testing, deployment, etc. Agile methods are simply a minimal version of this repeated fast and frequently. Release the minimum viable product then iterate. Unfortunately, so called "hacking culture" has led people to jump straight to development without considering analysis or design. Real hackers design their attacks first. Successful hacks are well thought out and executed in small brilliant steps. The analogies of sudoku in defining a problem and construction in defining a project are perfect, so I'll borrow those. If someone presents me with a 1000 sudoku puzzles of varying difficulty, the first step in estimating is to DESIGN a solution. Allocate time to categorize each puzzle by complexity. Then estimate times based on complexity based on past experience. Anyone who says they can't do this because they have no experience with the problem should be immediately fired. You've obviously misrepresented your experience and/or skills as an engineer of sudoku problem solving. If a problem is truly unique and novel (and very few are nowadays), then simply factor in time during the analysis & design to perform a few experiments that will more accurately help with estimation. Or training. OR HIRE SOMEONE WHO HAS DONE IT BEFORE to help with design and estimations. Then find the most effective resource to implement (solve) each puzzle. As for construction, any idiot can slap a few lines down on a piece of paper and call it a design for a house or a building. That's the way some people are building software. Real architects and engineers exist because construction can be broken down into hundreds of thousands of pieces and estimated accurately. They know exactly how many bolts it will take and what types of contingencies to allow for. Software, although abstract, is no different. The software industry has been around for 40+ years and it's modeled off past industries like construction and manufacturing. It can be accurately designed and estimated. Once a clear design exists, estimation is easy. My preferred estimation method is function point analysis. It's simple. Break each problem down into the smallest manageable piece. Any piece that takes longer than a couple of hours is too large and should be broken down further. That's an excellent rule of thumb. Anything longer than a couple of hours also suggests the design was poor. Of course, in some organizations this fails due to a lack of clear process. An analyst will be tasked at collecting business requirements to write a specification. That is often full of nonsense written by someone with no design experience. That specification is given directly to a developer for estimation and development. Where was the design? The nonsense works it's way into the product. It becomes an estimation nightmare. Projects and budgets run over or worse, fail. How do I know this works? When I break a job down for a client into small manageable pieces I know the entire scope and can estimate accurately. Clients love it because they can see every single piece of the puzzle in the design. The quantity and times for each piece look reasonable when broken down. The clients begin to appreciate the scope but ultimately don't care how it's built or what technology is used. They just want to know how much and when? If there is a deadline? Either add more resources or cut functionality. Let them make that choice. It's not my concern. The cream, and why this industry is so much better than construction and manufacturing, is to look at all the pieces and see the re-usable patterns. Design optimization. Copy, paste and re-use as much as possible. Clients don't care about re-usability. I charge top of market rate and still manage to be cheaper than competitors because my estimates were realistic (as opposed to their crystal ball methodologies). Re-usability and working smarter then gives me 4-5x that hourly rate. Shh! Don't tell the clients :) If you can't estimate software accurately, you're clearly in the wrong business!
- jasonhanley 13y agoSimple 5-step methodology: http://blog.pmrobot.com/2011/09/5-steps-to-estimate-software.html http://blog.pmrobot.com/2011/09/5-steps-to-estimate-software...