4 ms·
I was thinking the same thing. Eat the up-front build costs, but assure yourself a persistently-functional loop. Probably the type of thing best determined as
by uptown 13y ago
I was thinking the same thing. Eat the up-front build costs, but assure yourself a persistently-functional loop. Probably the type of thing best determined as part of the review-process, and not listed a requirement in the technical draft.