3 ms·
Reply to self: we already have been building tunnels through which we move air at high speed. Looking at https://en.wikipedia.org/wiki/Supersonic_wind_tunnel#Po
by Someone 13y ago
Reply to self: we already have been building tunnels through which we move air at high speed. Looking at https://en.wikipedia.org/wiki/Supersonic_wind_tunnel#Power_requirements https://en.wikipedia.org/wiki/Supersonic_wind_tunnel#Power_r..., I read:
"The power required to run a supersonic wind tunnel is enormous, of the order of 50 MW per square meter of test section cross-sectional area."
A train would be, say, 20 square meters in cross section. That would be a GW of power to operate this. And that likely is a severe underestimate. I am sure one cannot lengthen a wind tunnel to kilometers without lots of power loss, but for now, let's ignore that.
For reference: Looking at https://en.wikipedia.org/wiki/TGV#Rolling_stock https://en.wikipedia.org/wiki/TGV#Rolling_stock, a TGV uses at most 12MW at the relatively low speed of 300 km/h. Also, the three Gorges dam produces 22GW (http://en.wikipedia.org/wiki/List_of_largest_power_stations_in_the_world http://en.wikipedia.org/wiki/List_of_largest_power_stations_...)
- schiffern 13y agoI think that's just the power required to accelerate the air. A wind tunnel is a once-through system, not a loop.