3 ms·
Why isn't every installed UPS legally or contractually required to be a smart grid controllable grid tie inverter on demand? Probably because that would be rea
by nitrogen 13y ago
Why isn't every installed UPS legally or contractually required to be a smart grid controllable grid tie inverter on demand?
Probably because that would be really freaking expensive. Why go to all the expensive failure-prone trouble of making it easier to interrupt people's work and lives, instead of taking the cheaper, easier route of building reliable base load power generation? That's just another case of making the public bear the costs of a centralized benefit, just like fossil fuels' externalized costs.